Meridian Systems -- Commercial Security Integration
Security designed
to your floor plan.
We author a complete security overlay directly on your architectural drawings. Camera arcs, reader positions, PIR zones, and fire detector coverage all documented and approved before any material is ordered.
System specification
One integrated platform. Four protection layers.
All systems are engineered together from the start. Access events cross-reference camera timestamps automatically. Alarm zones tie directly to the floor plan schematic delivered to your security team.
Deployment process
From drawings to commissioning.
Site assessment
- Walk the facility with your facilities director and IT lead.
- Document all access points, blind spots, network topology, and conduit paths.
- Identify regulatory and insurance compliance requirements.
Deliverable: site survey report + risk register
Design + drawing
- Author the complete security overlay on your architectural drawings.
- Every device placement, cable run, and power drop is documented.
- Shop drawings submitted for AHJ approval before any material is ordered.
Deliverable: stamped security drawings + BOM
Installation
- Licensed low-voltage crews. Zero subcontractors for critical infrastructure.
- Phased installation to avoid operational disruption.
- Daily progress reports tied to the floor plan drawing set.
Deliverable: as-built drawings + test records
Commissioning
- Field testing of every device against the design specification.
- Staff training for operators and IT admins.
- 12-month support SLA with 4-hour response for critical faults.
Deliverable: commissioning certificate + SLA contract
Start the conversation
Every secure facility starts with a drawing.
Send us your architectural plans -- or just your address. We will perform a no-cost facility assessment and return a preliminary security design within five business days.